What are the steps of improving C section steel equipment ?
The improvement process of C-beam machine is completed in three steps:
The first step is to improve, adding a length measuring device and a flying saw. When the pressing length reaches the set length, the flying saw moves to automatically cut the profile.
The second step is to improve, add a hydraulic punching device with side holes, punch four holes at a time, and cut off the flying saw from the middle, thus forming two side holes for the head and tail of two adjacent sections of C-shaped steel.
The third step is to improve, add another hole punching device, punch out the hole at the interval set by the user in the process of strip steel pressing, and can drill 16 middle holes. The fourth step is to improve the requirements of the new C-shaped steel to make double holes in the middle of the profile. Change the 4-hole punching die for the side hole to a 2-hole die. Modify the side hole punching procedure so that the side hole punching equipment can make double holes in the middle. Holes, and the hole distance is set by the user, you can punch 8 groups of double holes.