Precautions for shelf installation

1. The rack installation should be constructed according to the drawings. When there is any inconsistency between the site and the design during construction, it should be proposed in time, and construction can only be carried out after the change is approved.

2. The various measuring and testing instruments, which is used in the installation of shelves need to comply with the provisions of the current national metrological regulations, and the accuracy level shall not be lower than the accuracy level required by the installation.

3. The concealed works before the installation of the shelves should be inspected before the concealed works, and the construction can be continued only after they are qualified.

4. Self-inspection should be carried out during the installation of shelves.

PREV
NEXT

RELATED POSTS

Become A LIMING Customer

LIMING-Metal Building Material Roll Forming Solution Provider
  • Free 3D profile drawing and installation profiles can be supplied.
  • All you inquires will be replied in 2 hours and you can contact our sales team at any time. Our service team is always online.
  • Exclusive VIP customer files.
  • The urgent order with 100% prepament has the priority of delivery.
]