Liming greenhouse skeleton production equipment
The greenhouse skeleton equipment is mainly a kind of greenhouse that is made of greenhouse rods, pressure rods, columns, and arches to cover the plastic film. Its shape is an arched round plastic greenhouse. It occupies a large area and has a very good heat absorption effect. It is convenient to build and the cost of building one is very low. This kind of greenhouse has become one of the tools that are widely used in social and rural planting products.
The frame steel of the greenhouse frame equipment is the “G” shape steel rolled by the hot-dip galvanized steel strip through the equipment. The current specifications are 70mmx45mm 50mmx30mm, and the thickness is 1.8mm2.0mm hot-dip galvanized steel frame frame. The installation method of the shed skeleton rib steel, the rib steel warm shed, if the shed span is large, the arch shed warm shed should be built for more than 15 meters, the top of the shed is directly covered with a quilt, and the columns should be appropriately added, and the 15 yard below To build a warm shed with a back wall, the diagonal tie rods use 4*4 square tubes, screws are fixed, no welding is needed, the longitudinal tie rods use 6-point small round tubes, special connection parts are connected, simple and convenient, and the cost is low, and the large-span columns use 4*6 Square tube, also fixed with screws.