Electrical safety precautions for LiMing Tile press
1. Inspect and maintain the electrical equipment on schedule according to regulations, and remove the unused electrical equipment circuits completely.
2. In case of power failure in the department, if there is an electric body distance inspection staff in the vicinity below 0.9 meters, dry wood rubber or insulating material shall be used as a reliable temporary shelter.
3, found that the pressure tile mechanical conductive part of the ground, before the power is not blocked, in addition to rescue shock, are not allowed to approach, leave the nearby 4 meters, 1.8 meters indoor leave, so as not to be damaged by the stepping voltage.
4, when repair tile press equipment, pull the switch and the knife, required in the switch and the knife hang “prohibit closing, someone work” sage in the electric equipment covered and no thoroughfare corridor column, should hang “, high danger “, work place should hang “someone working here” warning signs.
5, electrician must know the electrical circuit of the workshop and the types and functions of electrical equipment, do not fully understand the functions of electrical equipment, do not risk work.
6. The electrician shall check the cable, motor, electrical control console and other equipment on a daily basis, and timely deal with any problems found in the inspection.When checking the temperature of the motor, first check no electricity, and then test with the back of the hand.
7, in addition to temporary construction of electricity or temporary measures, do not allow temporary wire, do not allow disorderly hanging lights, instrument tools and welding machines and other applications of safety switch and socket, the original electrical circuit is not allowed to change without authorization.
8. The equipment must be connected to a safe ground wire.