Decking Floro Sheet Machine Usage
Introduction to the operation of floor support equipment
The operation of the floor support equipment is briefly introduced. The floor support equipment must first install the following steel beams and then lay the floor support plate on the steel beam. The contact between the floor support plate and the steel beam is generally anchored with anchors. As for welding: floor support The slab laying is connected with the steel beam, the end of the slab is penetrated by spot welding with the steel beam, the pierce and the steel beam are penetrated and welded in the middle, and the special clamping pliers are used to connect the floor between the floor plates.
The floor support board equipment must first install the following steel beams, and then lay the floor support board on the steel beam, and the contact part between the floor support board and the steel beam is generally anchored with anchors. As for welding: the floor support board is laid and connected with the steel beam, and the board end The penetration welding of the head and the steel beam, and the penetration welding of the peg and the steel beam in the middle,
The floor slabs are connected with special clamping pliers to engage the pressure holes, and the plugs are spot welded to the floor slabs and steel beams with special galvanized plugs. If it is an arc-shaped area, the special shape cutting of the floor slabs is cut by a plasma cutting machine , The incision is smooth, and the surface galvanized layer is complete.