Before using the tile press machine, please check whether the connections are secure, whether the bolts and nuts are tightened, and whether the lubricating oil is added to the chassis. After the inspection is completed, start the machine for test drive. When the empty car starts to run, pay close attention to whether there is vibration, noise, whether the oil window is oiled, and whether the parts and components are running normally. The mold can be installed after it is correct.

When installing the mold of the tile press machine, first cut off the power supply, and use electric tools to prevent electric shock protection. The worktable is indexed and raised to a high point, and a bracket is used as a support, placed between the worktable and the bottom surface of the sliding seat, and the anti-skid seat naturally falls, causing an accident.

The operator of the tile press is familiar with the performance of the electrical circuits and mechanical equipment in the workshop, and fully understands that risky operations are prohibited. The operator should regularly check the daily conditions of cables, motors, computer consoles and other equipment on a daily basis. If a problem is found, the power supply should be cut off immediately and the fault should be eliminated in time. When checking the temperature of the motor, make sure to check that there is no power before testing with the back of the hand. Except for temporary construction electricity or temporary measures, it is not allowed to connect wires without permission, and it is not allowed to hang lights arbitrarily. The switches and sockets of instrument tools and welding equipment, and the original equipment lines must not be changed without authorization. During the use of the machine, the electrical equipment shall be regularly repaired and maintained according to the regulations, and the aging and damaged electrical equipment lines shall be removed.

PREV
NEXT

RELATED POSTS

Become A LIMING Customer

LIMING-Metal Building Material Roll Forming Solution Provider
  • Free 3D profile drawing and installation profiles can be supplied.
  • All you inquires will be replied in 2 hours and you can contact our sales team at any time. Our service team is always online.
  • Exclusive VIP customer files.
  • The urgent order with 100% prepament has the priority of delivery.
]