Color steel tile equipment maintenance skills
First, hydraulic oil circuit
If the tile press hydraulic system maintenance should also be checked: first, check the oil tank level every week.Hydraulic oil should be filled when the oil level is lower than the oil window;Do not exceed 70℃. Second, the system oil temperature should be between 35℃ and 60℃.If it is too high, it will cause the disintegration of oil and fittings.Third, this machine USES hydraulic oil for ISOHM46 or MOBILDTE25, after every working 4000-6000 hours should change oil, fourth, the new machine should change oil after working 2000 hours.Clean the oil tank every time the oil is changed.
Second, Hydraulic components
1. Clean hydraulic components (substrates, valves, motors, pumps, tubing, etc.) monthly to prevent dirt from entering the system.Check whether there is deformation at the bend of each tubing of tile press.2. After the new machine is used for one month, if there is any abnormality, it should be replaced. After two months, it should tighten the connection of all accessories.
Third, Filter
The filter should be replaced or thoroughly cleaned: 1. Clean the filter every time the oil is changed, and check and clean it every 3 months.2. The air filter on the oil tank should be replaced once a year.3. The machine has related alarm or unclean oil and other filter abnormalities.